projects
Some projects
Remodeling extension. A complete bathroom was rebuilt here, including all water and wastewater connections.
Installation of a larger Europhat sewage treatment plant with 3 tanks for several houses. An active wastewater treatment plant without chemicals for a healthy environment.
The wooden shelter was partly built with old pallets and scrap wood. It has space for approx. 2-3 cubic meters of firewood.
Europhat sewage treatment plant
Installation of a larger Europhat sewage treatment plant with 3 tanks for 3 houses. Our customer relies on an active sewage treatment plant without chemicals for a healthy environment.
Kitchen assembly
Installation of a new Ikea kitchen including connection of water and sewage. All water and sewage pipes were reinstalled beforehand.
Installation of water and wastewater
The water and sewage pipes were newly installed for the new bathroom. Later, all fittings such as the toilet, washbasin and shower were connected.
Construction of wooden tool shed
Construction of tool shed including packing up the space and laying the garden slabs for construction.
Water and sewage pipes
Old water pipes were replaced with new copper pipes. In addition, new drain pipes were installed for the new kitchen and bathroom.
Water pump with distributor
New water pipes including a pump distribution box are dug in to make them winter-proof. A pump house is then mounted on top to keep it accessible in winter.
Stacking felled trees
According to the customer's request, we cut the felled trees to size and cut them to about 4m. We then built a stack on the property.